dedicated GPUs at the edgewe reply within one business dayabout two minutes to send

GPU capacity next to your devices and your data.

We put dedicated GPUs inside or beside the building where your machines, cameras or users already are. Tell us what you want to run and how fast it has to answer, and we’ll work out where the GPUs should go.

Start here

About 2 minutes

What brings you here?

Only this and your email are required. Skip anything you’re unsure about.

Nothing you send here commits you to anything.

What happens after you send it

  1. You tell us what you needOnly two questions are required. Answer the rest if you know them.
  2. We get back to youYou’ll hear from us within one business day.
  3. We talk it throughWe’ll discuss your workload, site and timing with you by email.

How capacity is delivered

pilot appliance → AI Rack → a full site
  • StartPilot appliance1–4 GPUs on a standard circuit, for 30–90 days
  • ScaleAI RacksOne AI Rack or a whole site, once you’re in production
  • PlaceClose to the workIn your building, on your campus or nearby in your metro

01Research

Why the GPUs go next to the work.

Three findings from research published in 2026. Each one puts a number on what distance costs.

  • Response time64%

    need responses in under 250 ms

    From a survey of 200 AI practitioners. Half of them miss that target at peak load.

    Akamai, May 2026
  • Robot task success80% to 70%:

    after 10 ms of added latency

    Two-armed robot tasks succeeded less often once 10 ms of one-way latency was added.

    UC Berkeley and Microsoft, March 2026
  • On-robot compute383%

    slower mapping and planning

    That’s the worst case when the work ran on the robot’s own Jetson Orin AGX.

    UC Berkeley and Microsoft, March 2026

02Who it’s for

Four kinds of teams ask us for capacity.

Each one needs the GPUs close for its own reason. Here’s the short version, with one piece of evidence for each.

Machine-adjacent industrial

Typical buyersPlant & operations leaders, Head of Automation, Robotics infrastructure, VP Engineering

The orchestrator is already on your floor

Run vision, robot and building-systems models on a unit in the same building. We are not asking you to change your architecture.

57%of manufacturers already use AI in machine visionCognex survey, March 2026

Regulated enterprise

Typical buyersCIO, CISO, Head of AI Platform, Chief Data Officer

Somebody has to see your data to run AI on it. We make sure it's nobody.

We run AI where your data and users live, and you pay only for responses that are accurate.

56% → 41%is how far public cloud’s share of production inference fell in one yearBroadcom survey of 1,800 IT leaders, June 2026

Inference platforms

Typical buyersHead of Infrastructure, Platform engineering, CTO

Capacity next to your users

We bring energized megawatts and a delivery date, inside the metros where your traffic already is.

30–50 msis all the network gets when a voice turn has to finish within 500 msFutureAGI, March 2026

Building and plant owners

Typical buyersOwners, REITs, Plant operators, Facility operators

Stranded power, contracted

The power your building already has becomes contracted, paid-first income when it hosts AI Racks.

61 monthsis the median wait between asking the grid for a connection and running on itLBNL Queued Up, June 2026

03How it works

What your answers tell us.

Most GPU request forms ask for a count, a term and a start date. Ours also asks how fast the answer has to come back and where your devices are. Add your data rules, and we know where the GPUs should sit.

Example request: machine vision in a warehouse

for illustration
An example request and what each answer decides
QuestionWhat you tell usWhat it decides
WhereAt my site in Dallas–Fort Worth, TXWe look for capacity in or near that building.
Latency budget10–20 ms round tripThis is the answer that decides how close the GPUs have to be.
Scale and term1–4 GPUs for a pilot of up to 90 daysFour GPUs or fewer fits a pilot appliance. It stands on the floor on a standard circuit, with no rack and no electrical work.
DataVideo must stay on siteIf the video can’t leave, the whole job runs inside your walls.
StartIn 1–3 monthsThis sets how soon we talk. Rack-scale requests that start within three months can pick a call time right after sending.
What we’d likely propose

We’d probably start with a fixed-fee pilot: one pilot appliance in or beside the warehouse for 30 to 90 days. Once it proves out on your own footage, production moves to AI Racks.

Please noteWe made this example up to show how the form works. Sending a request doesn’t hold any capacity for you. We confirm availability, dates and price with you on a call.

04Get started

Tell us what you’re trying to run.

Two answers are enough to start. We’ll ask about the rest when we reply.

Start your request
  • sending it doesn’t commit you to anything
  • we reply within one business day